Steamaster HPJ-2S Steam Cleaner, 2 Gallon
Features
All the details- 75-80 psi of steamReached in about 45 minutes from a cold start.
- Two layers of protectionA manual-reset low-water cut-off plus a 100 psi relief valve, on a UL-listed, ASME-code pressure vessel with its own National Board number.
- Ships ready to plug inFully assembled and pre-tested, on a standard 120 V/15 A household circuit — no plumbing hookup needed.
- Refill by handOnce the boiler runs low: bleed the pressure, top up through the funnel, and let it reheat.
- Backed for 5 yearsOn the boiler tank, 1 year on other parts.
The Steamaster HPJ-2S is a US-made, UL-listed steam-boiler cleaner built for the bench: a foot-pedal steam gun that blasts polish residue and water spots off finished jewellery. It ships fully assembled, plugs into a standard 120 V outlet, and needs no plumbing.
Works with
| Maker | Steamaster Co., Inc. (East Rutherford, NJ); parts and service now through Steamist |
|---|---|
| Model | HPJ-2S |
| Boiler size | 2 US gal (7.6 L) |
| Water fill, to the high mark | about 6.5 US qt (6.1 L) |
| Operating pressure | 75-80 psi (5.2-5.5 bar) |
| Heat-up time | 45+ minutes from cold |
| Heating element | 1.5 kW, 120 V |
| Electrical supply | 120 V, 60 Hz, 15 A (isolated 20 A circuit recommended) |
| Safety valve | 100 psi relief valve |
| Certifications | UL Listed; ASME Code Stamp pressure vessel |
| Size | about 17 x 7 x 24.5 in (43 x 18 x 62 cm) |
| Weight | about 75 lb (34 kg) |
| Warranty | 5 years on the boiler tank, 1 year on other parts |
Sold as
Each: the steam cleaner unit (fully assembled), electric foot-switch pedal, and power cord with plug. Not included: a printed manual (emailed instead), stand or basket.
Good to know
- Give it 45 minutes. Switch it on before the bench day starts — a cold fill takes at least 45 minutes to reach full pressure.
- Bleed the line first. Depress the pedal for about 5 seconds before steaming to clear condensation from the hose, so you don't spit water on the piece.
- Refill by hand: release the pressure, top up through the funnel to the sight-glass mark, and let it reheat. It isn't plumbed to a water line.
- Don't steam opals, cracked stones, or stones straight from the cold. Let cold pieces reach room temperature before steaming.
- Drain it weekly (daily in the first week): flush the boiler with plain water under reduced pressure, power off, and never let the water drop below the low mark.
Live steam and hot fittings can burn. Keep clear of the steam line during use, and place the foot pedal where it can't be pressed by accident. The safety valve must vent where it can't hit anyone or damage property; a plumber can pipe it to a safe spot if needed. The glass water-level gauge is a wear part: steam etches it over time, so check it regularly and replace it at the first scratch, chip or crack. The steamer poses no chemical hazard.